If you’re subdividing land in California, understanding Tentative Subdivision Maps is essential. Whether you’re a developer planning a proposed subdivision, a homeowner splitting a parcel, or an investor aiming to unlock land value, the Tentative Subdivision Map (TSM) is the foundation of the entitlement process.
At Golden State Design & Engineering (GSDE), we help clients navigate the technical and regulatory requirements behind every subdivision, whether it’s identifying existing topography and existing ground slopes equal to or more than four degrees, or designing proposed building pads and proposed improvements that meet grading and infrastructure standards.
A TSM must also account for how a project will unfold over time. Defining a clear proposed sequence of development is key to keeping phased projects on track. And because agencies require precise site data, your plans should reflect two foot intervals in flatter terrain and five foot intervals on steeper sites to clearly illustrate surface conditions.
This guide answers the most common questions about Tentative Subdivision Maps to get you started and moving forward.
A Tentative Subdivision Map (TSM) is a conceptual layout required under California’s Subdivision Map Act when dividing land into 5 or more parcels. It shows the proposed layout of lots, building pads, streets, infrastructure and other site features. The TSM must also show existing structures, existing trees, existing streets, existing easements, and existing contours. Any approximate slope greater than 4 degrees, fill slopes or other topographical features must be included.
Agencies also require a vicinity map showing roads, intersecting streets, peripheral streets and adjoining subdivisions. The submittal must include a sufficient legal description of the property and an approximate location of all features. This ensures the proposed site and layout meets local requirements for private or public use, setbacks and utility access.
Without an approved TSM, a Final Map cannot be recorded and new parcels can’t be sold, built upon or developed. For subdivisions with 4 or less lots, a Parcel Map may be sufficient.
California Government Code § 66452.6 states a Tentative Subdivision Map is good for 24 months from the date of approval. Local ordinances may allow for an additional 12-month extension. After that, developers can request discretionary extensions up to 6 years if circumstances justify and the planning department finds the extension request is in a manner acceptable under the law.
Phased projects may qualify for additional time per phase, typically 3 years per phase, not to exceed 10 years total. It’s important to coordinate extensions proactively, once a map expires the project must restart the application process.
Yes. Extensions are granted through a formal application process. To be considered the Tentative Map must be deemed complete by the planning department and meet submittal standards including data sufficient to demonstrate progress.
The developer must often provide updated engineering data, a current separate grading plan, and proposed contours at appropriate contour intervals (typically 2 foot intervals in flat terrain or 5 foot intervals in steeper areas). An updated environmental assessment may also be required if the existing ground slope has changed or if proposed recreation sites, approximate elevations, or proposed density metrics have changed.
Working with GSDE ensures your map stays valid and your extension strategy is aligned with changing local policies.
A Tentative Map sets the stage for review but a Vesting Tentative Map (VTM) offers more certainty. With a VTM the applicant “vests” under the regulations in place at the time of approval insulating the project from future zoning changes, design shifts or fee adjustments.
This is especially useful for long-term or phased developments. For example a commercial development proposing phased construction over several years may use a VTM to preserve consistent entitlements. However VTMs require more detailed documentation up front including approximate finished grading, approximate dimensions of lots, proposed units, proposed slopes, and a more robust preliminary design.
Local agencies, especially the planning commission, may deny a Tentative Map for several reasons. A project can be rejected if it conflicts with the general or specific plan, lacks access to existing sewers or existing sanitary sewers, or fails to show physically suitable building sites.
The commission will also review if the TSM has a right of way width that meets street standards and if existing structures identified on-site could interfere with the proposed site layout. If the approximate lot layout or proposed contours suggest excessive grading or unsafe conditions this can lead to a denial. Even issues as specific as such angle of lot orientation relative to sun exposure, street frontage or approximate slope may be reviewed.
GSDE helps prevent denials by performing thorough site studies and providing accurate plans backed by licensed professionals.
The California Environmental Quality Act (CEQA) requires environmental review for Tentative Maps. CEQA compliance varies based on the project’s impacts such as grading near wetlands, traffic generation or displacement of existing trees.
Three outcomes are possible:
Public participation is key to CEQA and public hearings are typically required unless exemptions apply. CEQA documents must be supported by engineering data, site-specific maps and other data such as habitat assessments or historical surveys.
GSDE ensures all CEQA requirements are considered in the person preparing the map and documentation, working alongside your environmental consultant and soils engineer when needed.
The Tentative Subdivision Map process includes multiple coordinated steps:
Each submission must include a licensed land surveyor’s certification, a legal owner authorization letter, and a vicinity map showing roads within the project area.
Recent California legislation has simplified subdivision approval for smaller housing projects:
These laws reduce the barrier to entry for proposed units in urban areas by clarifying what constitutes a proposed density that meets local housing goals. They also shift more authority to staff-level approvals when the project meets specific standards.
To ensure the Tentative Map is complete, you’ll need:
GSDE has all of these roles in one team, so each building site is planned with precision, compliance and efficiency.
Once the TSM is approved by the city council, the next step is to fulfill all Conditions of Approval. These may include a separate grading plan, proposed contours and utility coordination for water, sewer and storm systems.The Final Map is prepared and sent through final engineering review. It must show the location, dimensions, and sequence of development. After approval and bonding, the map is recorded and the project is clear to build or sell lots.
GSDE stays involved through the entire post-approval phase, preparing engineering data, working with public agencies and supporting fieldwork during construction.
Tentative Subdivision Maps are the foundation of land development in California. Whether you’re building custom homes, townhomes or a commercial project, understanding the TSM process and avoiding common pitfalls can save your schedule and budget.
With years of experience in land use planning, civil engineering and surveying, GSDE is your go-to partner in Sacramento, Santa Rosa, San Jose and beyond.
Let GSDE guide you from concept to construction. Contact us today for a free consultation.